\"

Main Conference Day 1 | 21 February 2017

08:15 AM - 08:50 AM Morning Refreshments & Registration

08:50 AM - 09:00 AM Opening Remarks from Chairperson

9:00 AM - 9:45 AM How can Power Companies Benefit from the Top 10 Global Trends in Infrastructure?

Mel Karam, Head of Global Asset Management, KPMG
  • Discussing impacts of recent changes in Asia’s power market landscape
  • Is this the end of lump-sum turn-key contracts?
  • What are the implications for your long-term asset maintenance strategy?
  • The future of maintenance management: key pathways forward, preconditions for adoption and tips for easing the transition

img

Mel Karam

Head of Global Asset Management
KPMG
Major moves by global power plant producer Ansaldo Energia (AEN) have been rocking the power sector. In end 2015, AEN finalised the takeover of major Alstom assets and technologies from General Electric - and in mid-2016, AEN won unlimited rights to use Siemens technology for heavy duty gas turbines. Today, it holds all rights to supply, servicing and upgrading for GT26 and GT36 heavy duty gas turbines along with all Siemens gas turbines. In this session, hear directly from the world’s next leader of gas turbine supply on market plans, new announcements and what this spells for Asia’s power market.

Fausto Nepote, Managing Director, Ansaldo Thomassen Gulf & Head of Service Sales, Middle East & Asia Region

Managing Director, Ansaldo Thomassen Gulf & Head of Service Sales, Middle East & Asia Region
Ansaldo Energia

Roberto Masala

Service Product Manager AE/V Gas Turbines
Ansaldo Energia

10:35 AM - 11:00 AM Morning Coffee & Networking Break

11:00 AM - 11:45 AM [Case Study] New Technologies for Near-Instant Start-Up, Rapid Cycling and Clean Performance at Petronas’ New State-of-the-Art Combined-Cycle Power Plants in Kuantan

Ismail B Musa, Principle Engineer, Rotating Equipment, PETRONAS Gas Berhad , ,
  • From 2 days to split seconds: how is Petronas achieving fast, frequent and yet reliable start-up of GE Frame 6 machine? How to eliminate repeated start-up cycles and save millions of dollars in plant start-up time?
  • What new technologies are available for online filtration system replacement without plant shutdown?
  • Proven fuel consumption savings and emissions reductions during start-up and at full power
  • Boosting load change rates and reducing damage due to extreme load cycling and damage for long-term maintenance cost-savings

img

Ismail B Musa

Principle Engineer, Rotating Equipment
PETRONAS Gas Berhad

8:00 AM - 8:40 AM Simplifying Maintenance & Saving Energy with New Direct Drive Cooling Tower Motors

Anders Annell, Global Power Generation Segment Manager, ABB Anders Annell, Global Power Generation Segment Manager, ABB
  • Understanding the disadvantages of traditional cooling towers
  • How can new designs in cooling towers reduce mechanical parts, likelihood of failure and simplify overall maintenance?
  • Case studies from US and Europe in how equipment decisions translated to 5-10% improvement in efficiency and savings of thousands of dollars per year

img

Anders Annell

Global Power Generation Segment Manager
ABB
img

Anders Annell

Global Power Generation Segment Manager
ABB

12:20 PM - 12:30 PM Speed Networking Session

12:30 PM - 1:30 PM Lunch & Networking Break

1:30 PM - 2:15 PM Break The 35 GW Maintenance Service Challenges Through Development Of PT. PLN (Persero) MRO Unit

Mochamad Soleh, Mechanical Engineer, PT Indonesia Power


Mochamad Soleh

Mechanical Engineer
PT Indonesia Power

img

John DiVitto, Project Developer – International Utility Retrofit Projects, Babcock & Wilcox

Project Developer – International Utility Retrofit Projects
Babcock & Wilcox

3:00 PM - 3:30 PM Afternoon Tea & Networking Break

3:30 PM - 5:00 PM Technical Roundtables: Debating Causes of Failure & Recurrence Prevention

Feeling worn down by the never-ending battle against wear and tear, fatigue or sub-optimal operations? What issues are plaguing other power plants that use similar equipment? During our roundtables, hear from peers’ case studies and failure events while sharing your experiences and discussing ways to prevent downtime!

In 3 x 25-min sharing sessions (15-min break in between), speak directly with senior engineers and technical specialists working on thousand-megawatt plants! Learn and share on:

  • What sources of vulnerability have been identifi ed in other power companies using similar equipment? How are these being addressed?
  • Root causes behind unexpected equipment failure and actions taken
  • What are other technical specialists investigating during abnormal failure?

Roundtable 2: Issues in Rotating Equipment
Moderated by: Fausto Nepote, Managing Director of Ansaldo Thomassen Gulf & Head of Service Sales, Middle East & Asia Region, Ansaldo Energia

Roundtable 2: Pressure Equipment & Boiler Issues
Moderated by: John DiVitto, Director & Project Developer, International Utility Retrofit Projects, Babcock & Wilcox

Roundtable 3: Transformers & Balance-of-Plant
Moderated by: Putu Arya Adiputra, Maintenance Management Development Specialist, PT. TJB Power Services

5:30 PM - 5:45 PM Closing session